Peveka.
Solutions

WHO WE
SERVE

Built for every capital project environment where controls failures have real consequences — from DOE nuclear facilities to transit megaprojects to Tier-1 general contractors.

01
Featured

DOE & Federal Programs

The most demanding controls environment we serve.

Program managers, owner's representatives, and EVMS analysts operating under DOE Order 413.3B, DCMA 14-Point surveillance, and multi-prime construction environments. FedRAMP-Compatible Architecture and IL4-Deployable Design — runs within client-authorized federal cloud enclaves. Zero data leaves the federal boundary.

DOE Order 413.3B & EVMS Compliance

Peveka's forensic engines are calibrated to the specific requirements of DOE Order 413.3B and the associated Program and Project Management directives. EVMS surveillance readiness, IBR preparation, and continuous 14-Point compliance monitoring are built into the platform's standard operating modes. Every metric, every finding, and every corrective action path is grounded in the DOE project controls framework — not a generic EVMS implementation.

  • DOE Order 413.3B compliance monitoring as a standard feature
  • IBR readiness assessment and documentation package generation
  • Continuous 14-Point compliance monitoring between surveillance events
  • DOE-specific regulatory corpus pre-loaded in knowledge base

FedRAMP High & Multi-Prime Oversight

For programs requiring FedRAMP High or DOD IL4 compliance, Peveka deploys within the client's own secure government cloud enclave. DOE capital programs frequently involve multiple prime contractors — Peveka's Master Strategist synthesizes performance across all prime contracts into a unified program-health view, identifying interface risks and owner obligation deadlines that cut across multiple contracts.

  • FedRAMP High authorized inference backend (Vertex AI GCP Government)
  • DOD IL4 enclave configurations available
  • Zero data leaves the federal boundary
  • Unified performance view across multiple prime contracts
02
Featured

Defense Prime Contractors

CPCs, IMS deliverables, and IPMR reporting.

Controls leads and project engineers managing Integrated Master Schedules, Cost Performance Reports, and DCMA surveillance obligations. Integrates with your existing scheduling and cost environment — P6, MS Project, Cobra, and others. No rip-and-replace required.

IMS Integrity & DCMA Compliance

Defense programs operating under DCMA surveillance require Integrated Master Schedules that meet rigorous structural and metric thresholds. Peveka validates IMS structure against DCMA 14-Point requirements, identifies logic gaps, float anomalies, and constraint violations, and generates corrective action paths before each CPR submission.

  • IMS structure validated against DCMA 14-Point thresholds continuously
  • Logic gaps, float anomalies, and constraint violations identified
  • Corrective action paths generated before each CPR submission
  • Pre-surveillance assessment package generated automatically

IPMR-Ready Variance Analysis

Peveka generates variance analysis documentation — schedule variance (SV), cost variance (CV), and variance at completion (VAC) narratives — formatted for inclusion in IPMR Format 5 and Format 6 submissions. Variance narratives are generated from actual schedule and cost data, ensuring consistency between the IPMR submission and the underlying performance record.

  • SV, CV, VAC narratives generated from actual schedule and cost data
  • Formatted for IPMR Format 5 and Format 6 submissions
  • Corrective Action Plan (CAP) documentation generated alongside variance narrative
  • FAR/DFARS notice requirements mapped to schedule actuals
03

Tier-1 General Contractors & ENR 400

Margin protection at program scale.

Large-scale construction programs where schedule logic failures, missed notice windows, and unresolved claims cost margin. Works with the scheduling and cost platforms already running in your PMO. Reads your General Conditions and flags procedural deadlines before the exposure window closes.

Schedule Logic & Margin Protection

On a complex construction program, a broken predecessor relationship in the critical path is not a scheduling error — it is a margin event. If the logic failure propagates to a contractual milestone and the notice window passes without written notice, the claim is waived. Peveka catches broken logic at ingestion, before it reaches the milestone.

  • Broken predecessor logic identified at ingestion, before milestone impact
  • Critical path integrity validated continuously across program lifecycle
  • Notice window monitoring starts at ingestion, not at the milestone
  • Claim preservation tracked before procedural deadlines close

PMO Integration & Claims Readiness

Peveka integrates with the scheduling and cost platforms already running in your environment — Oracle Primavera P6, Microsoft Project, Asta Powerproject, Deltek Cobra, Prism, and others — without requiring replacement or migration. When a claim does arise, the platform provides the forensic schedule history required to substantiate it.

  • Oracle Primavera P6, Microsoft Project, Asta Powerproject
  • Deltek Cobra, Prism, and other major cost platforms
  • No tool replacement or data migration required
  • Full forensic schedule history available for claims support
04

Transit, Infrastructure & Utility Owners

Multi-prime capital program oversight.

Public owners and program managers overseeing transit expansions, water infrastructure, grid modernization, and utility capital programs. Peveka's forensic engines read your contract structure and flag conflicts between owner obligations and contractor schedule submissions — across multiple prime contracts simultaneously.

Multi-Prime Contract Oversight

Public capital programs frequently involve multiple prime contractors. Conflicts between prime schedules — where one prime's delay creates interface risk for another — are difficult to identify when each prime's schedule is reviewed independently. Peveka reads all prime schedules as a unified dataset and surfaces interface conflicts automatically.

  • All prime schedules read as a unified dataset
  • Interface conflicts between prime schedules identified automatically
  • Owner obligation deadlines tracked across all contracts
  • Unified program-health view for Owner's Representative oversight

Owner Obligation & Grant Compliance

Public owners have their own contractual obligations to contractors — timely review of submittals, utility relocations, right-of-way delivery, design releases. Peveka maps owner obligation deadlines against the current schedule and flags approaching deadlines before they become contractor claims. Grant compliance frameworks (FTA, FHWA, EPA) are pre-loaded in the knowledge base.

  • Owner obligation deadlines mapped to contractor schedule activities
  • Approaching deadlines flagged before contractor claims arise
  • FTA, FHWA, EPA grant compliance frameworks pre-loaded
  • Tamper-evident audit trail for public accountability reviews
05

Oil, Gas & LNG

EPC megaprojects where FIDIC governs and P6 runs everything.

EPC program managers, cost engineers, and owner's representatives at LNG terminals, refineries, and petrochemical facilities. FIDIC Silver and Yellow Book contracts are the standard; P6 and Cobra are the operating environment. Peveka's forensic engines are calibrated to both — reading your actual project data to surface entitlement, delay, and cost exposure before it hardens into a dispute.

FIDIC Entitlement & Delay Analysis

EPC schedules at LNG terminals and refineries routinely involve concurrent delay, contractor-caused disruption, and owner-caused events running in parallel. FIDIC Sub-Clause 20.1 requires written notice within 28 days of the first awareness of a delay event — and that window is strictly enforced at arbitration. Peveka tracks every potential claim event against the P6 baseline, identifies the applicable FIDIC obligation, and flags approaching notice windows before entitlement is lost.

  • FIDIC Sub-Clause 20.1 notice obligations tracked against P6 actuals
  • Concurrent delay analysis across contractor and owner-caused events
  • Clause 8 extension of time entitlement mapped to schedule impact
  • 28-day notice windows flagged before they close

P6 & Cobra Integration for EPC Programs

LNG terminals and refinery programs run on Oracle Primavera P6 for schedule and Deltek Cobra for earned value. Peveka ingests both natively — creating a unified forensic layer that links cost variance directly to schedule activities. When an overrun surfaces in Cobra, Peveka identifies the P6 activity driving it, the responsible party, and the FIDIC clause governing the exposure.

  • Oracle Primavera P6 and Deltek Cobra ingested natively
  • Cost variance linked directly to the P6 activity driving it
  • FIDIC clause mapped to every identified cost or schedule exposure
  • Full EPC program history retained for claims substantiation